Healthcare project engineers coordinating investment, design and facility delivery
OWNERSHIP & RISK

Choose the commercial architecture before committing the capital.

Six delivery models. Different ownership, control and risk positions. The right structure is selected before equipment, construction and financing decisions become difficult to reverse.

MODEL SELECTION

The same facility can create six very different investor exposures.

A project model determines who signs the contracts, who carries integration risk, when ownership transfers, how capital is released and who must operate the asset. Infinity IVD tests these questions against the project country, investor capability, demand evidence and financing route before recommending a structure.

DECISION SNAPSHOT

Control, contracting and operating responsibility

ModelPrimary contract positionIntegration exposureBest strategic use
Turnkey EPCSingle integrated delivery contractPrimarily within contracted EPC boundaryDefined scope and single responsibility
EPCMClient holds multiple package contractsShared; client retains package exposureComplex, transparent or phased programmes
BOTProject company and concession structureProject company through operating termRevenue-backed infrastructure
Technology TransferLicence plus defined transfer servicesLicensee owns manufacturing complianceExisting local facility or manufacturer
Joint VentureJV entity under shareholder governanceAllocated through governance and contractsLocalisation and shared market entry
Phased CAPEXSeparate authorised phase packagesDefined at every expansion gateDemand-led scale-up
Engineering team coordinating an integrated medical manufacturing facility01 / 06One contract. One integrated delivery boundary.
INVESTMENT STRUCTURE 01

Turnkey EPC

Best fitInvestors who want a defined facility, coordinated responsibility and one acceptance route from design basis to operational handover.

Ownership & contracting

The client funds and owns the asset. Infinity IVD, or the agreed EPC entity, manages the contracted engineering, procurement, construction and integration scope.

Commercial logic

A contract price and programme are established against an approved design basis, scope boundary, assumptions and change mechanism. Payments follow measurable milestones rather than equipment arrival alone.

Infinity IVD scope

  • Design basis and coordinated engineering
  • Equipment and technology-package integration
  • Construction and installation management
  • Commissioning, qualification and handover dossier

Client ownership

  • Land, permits and agreed site information
  • Timely approvals and change decisions
  • Funding, duties and owner-supplied scope
  • Appointment of the future operator

Control gates

  • Scope freeze before major procurement
  • Approved vendor and interface registers
  • FAT, SAT and qualification evidence
  • Provisional and final acceptance gates

Investor advantageThe clearest route when the investor values a single integration boundary more than direct control of every individual package.

Exposure to resolveClient changes, latent site conditions, authority decisions and expressly excluded works remain outside a fixed delivery promise unless contracted.

Assess Turnkey EPC for this project ↗
Investor and engineering team reviewing healthcare project planning information02 / 06Owner control with professional programme integration.
INVESTMENT STRUCTURE 02

EPCM

Best fitLarge, complex or phased programmes where the client wants direct visibility of suppliers, package prices and contracting decisions.

Ownership & contracting

The client owns the asset and normally contracts construction and equipment packages directly. Infinity IVD acts as engineering, procurement and construction manager.

Commercial logic

Infinity IVD’s professional services are separated from third-party package costs. Open-book procurement can improve transparency, but the client retains more contracting and interface exposure.

Infinity IVD scope

  • Programme and design management
  • Tender packages and bid evaluation
  • Cost, schedule and interface control
  • Site supervision and commissioning coordination

Client ownership

  • Direct package contracts and payments
  • Owner contingency and commercial decisions
  • Local contractor appointments
  • Acceptance of residual package risks

Control gates

  • Package procurement plan
  • Integrated master schedule
  • Cost and change-control dashboard
  • Cross-package interface register

Investor advantageThe investor sees where capital is committed and can approve suppliers package by package while maintaining one programme-management layer.

Exposure to resolvePrice, performance and claims can sit across multiple client contracts; strong owner governance and rapid decisions are essential.

Assess EPCM for this project ↗
Modern turnkey hospital complex designed for long-term operation03 / 06Build and operate before contractual transfer.
INVESTMENT STRUCTURE 03

BOT

Best fitPublic or strategic healthcare infrastructure with a viable operating model, predictable demand and a legally workable concession or offtake structure.

Ownership & contracting

A project company develops and operates the asset during the concession period. Transfer to the agreed public or private beneficiary occurs under defined conditions.

Commercial logic

Capital may combine sponsor equity, debt, development finance and operating revenue. Bankability depends on demand, tariff, offtake, foreign-exchange, tax and sovereign-risk allocation.

Infinity IVD scope

  • Technical feasibility and output model
  • EPC and technology integration planning
  • Operational-readiness architecture
  • Handover and transfer-condition definition

Client ownership

  • Concession and land framework
  • Demand or offtake arrangements where applicable
  • Government and lender approvals
  • Transfer and continuity obligations

Control gates

  • Bankable feasibility gate
  • Independent technical due diligence
  • Performance and availability tests
  • Lifecycle maintenance and transfer standards

Investor advantageDelivery and operating performance are connected, so the facility is designed around sustained service rather than construction completion alone.

Exposure to resolveBOT is not suitable without credible demand, enforceable contracts and country-specific legal, tax, financing and currency analysis.

Assess BOT for this project ↗
Molecular diagnostics production and technology transfer environment04 / 06Local production capability without buying an undefined promise.
INVESTMENT STRUCTURE 04

Technology-Transfer Licence

Best fitExisting manufacturers, distributors or governments that already control a suitable facility and need defined products, processes, documentation and competence transfer.

Ownership & contracting

The licensee owns the facility and operates production. Intellectual property, permitted markets, products, duration and improvement rights remain governed by the licence.

Commercial logic

The structure may combine an initial transfer fee, product or territory licence, training and validation services, raw-material obligations and continuing royalty or technical support.

Infinity IVD scope

  • Technology-transfer dossier and process parameters
  • Training, pilot batches and competency verification
  • Equipment URS and process-layout input
  • Quality and regulatory evidence support

Client ownership

  • Facility, utilities and production personnel
  • Local QMS and legal-manufacturer obligations
  • Market registration and ongoing compliance
  • Approved sourcing and change control

Control gates

  • Transfer-readiness gap assessment
  • Defined acceptance batches
  • Competency and document matrix
  • Post-transfer change and support protocol

Investor advantageThe investor acquires an operating method, controlled know-how and trained capability instead of a production line with no validated process.

Exposure to resolveA licence does not replace competent-authority approval, local quality ownership or the licensee’s responsibility to maintain the validated state.

Assess Technology-Transfer Licence for this project ↗
International partners planning local healthcare manufacturing capacity05 / 06Capital, market access and technical capability under one governance system.
INVESTMENT STRUCTURE 05

Joint Venture

Best fitLocalisation programmes where one partner contributes market access, land, funding or public relationships and another contributes technology and delivery capability.

Ownership & contracting

The JV entity normally owns the project assets and contracts. Shareholding alone does not define operational control; reserved matters and delegated authorities must do so.

Commercial logic

Partner contributions are valued and documented before investment. Funding calls, dilution, dividends, related-party procurement and exit rules are agreed in the shareholders framework.

Infinity IVD scope

  • Technical scope and transfer package definition
  • Facility and capacity feasibility
  • Operational and quality-governance design
  • Engineering and delivery services under agreed contracts

Client ownership

  • Local corporate and licensing structure
  • Market access and commercial execution
  • Agreed capital and in-kind contributions
  • Local governance and operator appointments

Control gates

  • Independent contribution valuation
  • Reserved-matters schedule
  • Deadlock, dilution and exit provisions
  • Related-party and IP protections

Investor advantageThe structure can combine local access with proven technical capability while aligning both parties to the facility’s operating outcome.

Exposure to resolveWeak governance can destroy a technically viable project. Valuation, decision rights, IP, compliance ownership and exit must be resolved before CAPEX.

Assess Joint Venture for this project ↗
Modular medical manufacturing facility planned for phased capacity expansion06 / 06Commit capital only when the next demand gate is proven.
INVESTMENT STRUCTURE 06

Phased CAPEX

Best fitDemand-led market entry, uncertain procurement volumes or investors who need to reach initial production before funding the full target capacity.

Ownership & contracting

The client owns each completed phase. Equipment, utilities and space are selected against a master plan so later expansion does not invalidate earlier investment.

Commercial logic

CAPEX is divided into controlled stages such as feasibility, core infrastructure, initial production, automation and capacity expansion. Every phase has its own acceptance and release decision.

Infinity IVD scope

  • Expandable master plan and utility strategy
  • Phase-specific equipment and cleanroom packages
  • Interface preservation between stages
  • Capacity validation and expansion triggers

Client ownership

  • Demand evidence and release approvals
  • Funding for each authorised phase
  • Protection of future expansion zones
  • Operating data used for the next gate

Control gates

  • Minimum viable facility definition
  • No-regret infrastructure decisions
  • Predefined expansion interfaces
  • Volume, quality and cash-flow release criteria

Investor advantageThe model limits premature capital while preserving a controlled route from market entry to automated high-volume operation.

Exposure to resolveFalse economy appears when phase one ignores future HVAC, utilities, flow, footprint or regulatory requirements. The master plan must precede the first purchase.

Assess Phased CAPEX for this project ↗
STRUCTURE BEFORE PROCUREMENT

A delivery model should be an output of feasibility—not a label chosen in advance.

The initial review compares project maturity, owner capability, available capital, demand certainty, country risk, regulatory endpoint and desired operating control. The result is a recommended structure, contract map and list of conditions that must be satisfied before investment approval.

Request model & feasibility review ↗
Important boundary

BOT, joint-venture and financing structures require country-specific legal, tax, accounting and financial advice. Infinity IVD provides project, technical and delivery-structure inputs; this page is not a financing offer, legal opinion or guarantee of regulatory approval.